Agency |
Title |
Date published |
Bid opening date |
Rogers Water Utilities |
2025 CIPP Sewer Rehab
|
The project consists of installation of approximately 2,500 linear feet of 24” UV Cured CIPP sewer main, 400 linear feet of 8” UV Cured CIPP sewer main, 105 point repairs across 6”, 8”, 10”, & 15” sewer main, and Service Repairs.
https://www.centralauctionhouse.com/rfp75035144-2025-cipp-sewer-rehab.html
29-Sep-2024 12:00:00 AM CDT |
16-Oct-2024 2:00:00 PM CDT |
Rogers Water Utilities |
2025 Manhole Rehab
|
The project consists of installation of approximately 75 ring and lid replacements, 28 manholes raided, 350 vertical feet of epoxy lining, 150 vertical feet of cementitious lining, 2 manhole trough rework, and 3 manholes repaired by grout injections through the bench.
https://www.centralauctionhouse.com/rfp89258805-2025-manhole-rehab.html
29-Sep-2024 12:00:00 AM CDT |
16-Oct-2024 2:15:00 PM CDT |
Rogers Water Utilities |
2025 Pipe Bursting Sewer Rehab
|
The project consists of installation of approximately 3,615 linear feet of 6” to 8” sewer main and 780 linear feet of 8” to 8” sewer main by pipe bursting with approximately 120 service connections.
https://www.centralauctionhouse.com/rfp9974735-2025-pipe-bursting-sewer-rehab.html
29-Sep-2024 12:00:00 AM CDT |
16-Oct-2024 2:30:00 PM CDT |