REROOF MEN’S DORMITORY
Mississippi > Southwest Mississippi Community College
Solicitation: 21873576
Listing Information/Advertisement:



 
Roof Replacement – Men’s Dormitory
Southwest Mississippi Community College
Summit, MS 39666
Project #1911

Bids for construction of the above captioned project will be received on Thursday, October 17, 2019 at 2:00 pm at the Office of the President in the Administration Building, Southwest Mississippi Community College, 1156 College Dr., Summit, Mississippi, 39666, and read aloud. Bidders are welcome to attend the bid “opening”, but attendance is not mandatory. Bids are to be submitted in either electronic format or in a sealed envelope as described in the “Instructions to Bidders” section of the Contract Documents. Architect – Cox Architecture,
McComb.

PLANSETS: Bid documents are being made available via hard copy or electronically in Adobe® pdf format. Documents can be viewed and ordered at www.coxarchplans.com. Interested bidders should log-in or register for a free account to view and order Bid Documents (Valid email address required). The cost of the bid documents is $50.00, non-refundable. Questions regarding online document orders and website registration shall be directed to Plan House Printing at (601) 336-6378.

SUBMITTAL OF BID PROPOSALS: Each bid must be submitted in either a sealed envelope or electronically transmitted in Adobe® PDF format. All bid proposals shall include fully executed bid form(s) and all additionally required documentation in accordance with the “Instructions to Bidders” which are bound in the Project Manual and in accordance with the Bid Laws of the State of Mississippi. The Owner reserves the right to waive irregularities and to reject any or all bids. ELECTRONIC BID SUBMITTAL: Shall be submitted electronically through the Central Bidding portal – www.centralbidding.com where plansets in electronic format are also available.

SCOPE OF THE WORK: This project entails removal of existing roof system down to original concrete roof deck and installation of new roof system as indicated in the contract documents.

BY: Dr. Steve Bishop, President
Southwest Mississippi Community College
1156 College Dr.
Summit, MS 39666

Dates of Publication: 
Thursday, September 12, 2019
Thursday, September 19, 2019 
 

SUBMITTAL INFORMATION
Creator Username: CoxArchitecture
Bidding Privacy: Bid encryption
Started: 18-Sep-2019 2:06:50 PM CDT
Ends: 17-Oct-2019 2:00:00 PM CDT ( Expired )
History: 789 Views
Event Status: Expired since 17-Oct-2019 2:00:00 PM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::