Rotary Point Bulkhead and Walkway
Louisiana > Bayou Vermilion District
Solicitation: 24171277
Listing Information/Advertisement:


This project consists of all labor, equipment and material to replace of 220 linear feet of timber bulkhead and walkway with a new anchored sheet pile bulkhead and new timber walkway at Rotary Point on the Vermillion River, Lafayette Parish.  This includes removal and disposal of the existing bulkhead, installation of steel sheet piles, installation of anchor system including helical anchors, and construction of a new timber walkway and staircase. 

There will be a mandatory pre-bid meeting in the Vermilionville Conference Room on Monday, June 18 at 1pm at 300 Fisher Road, Lafayette, LA 70508.

For inquiries, please contact Whit Rankin at [email protected] or 337-442-6252.

Additional Notes/Requirements
In addition to uploaded files, there is also a CAD file available upon request.
PUBLIC MESSAGE BOARD
Discuss questions with the owner/creator of this Listing.
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
30-Jul-2018 3:57:42 PM CDT
Addenda 6 and 7 added. Deadline pushed back to August 6 at 2pm.
30-Jul-2018 9:15:51 AM CDT
Addendum 5 added
23-Jul-2018 2:20:41 PM CDT
The following documents have been removed:07032018 Addendum 1 Project Specifications.pdf 07122018 Addendum 2 Bid Bond Form.pdf Rotary Point Bulkhead Replacement - Specifications.pdf Rotary Point Bulkhead Replacement Bid Bond Form.pdf. The following document has been added: 07232018 Addendum 1 Project Specifications.pdf.
13-Jul-2018 1:42:48 PM CDT
The deadline has been extended one week to July 24, 2018. Please see additional documents.