Renovations to the Football Stadium at Loreauville High School Attachment: Specifications.pdf 
Iberia Parish School Board
Sealed Bid: 24924087
Listing Information/Advertisement
WORK INCLUDED 
This work is to be done at the Football Stadium at Loreauville High School in Loreauville,Louisiana.           
Items to be included in the BASE BID: 
    1. Repair broken concrete areas in the stadium structure.
    2. Chain link fencing.
        a.  Remove the existing chain link fencing fabric at the front of the stadium andreplace it with new chain link fencing fabric.  Sand and paint the vertical fence
             posts. Replace the top rail of the fence.
        b.  Remove the existing chain link fencing fabric at the left and right sides of the Stadium and replace it with new chain link fencing fabric.  Sand and paint                      the vertical fence posts. Replace the top rail of the fence.
        c.  Remove the existing chain link fencing fabric at the left and right stair entrances of the stadium and replace it with new chain link fencing fabric.  Sand                      and paint the vertical fence posts. Replace the top rail of the fence.
        d.  Remove the existing chain link fencing fabric at the rear of the stadium and replace it with new chain link fencing fabric.  Sand and paint the vertical fence
             posts. Replace the top rail of the fence.
        e.  Remove the steel pipe rail at the left side of the stadium seating.
         f.  Remove the existing trapezoid chain link gates and adjacent fencing at the right and left entrances to the underside of the stadium.  Replace the gate                       and fencing with a new chain link gate and chain link fencing.of the Plans.
    3.  Pressure wash the entire exterior of the stadium.  This includes all concrete surfaces, concrete block walls, metal roof, wood walls & trim, etc.  
    4.  Paint all paintable surfaces on the exterior and interior of the Press box.
    5.  Pour new concrete slabs at each end of the underside of the stadium at Open Dirt Area 112. 
    6.  Pour new limestone at the underside of the stadium at Open Dirt Area 112.
    7.  Remove the existing metal lockers in Dressing 108 and
    8.  Install 50 new metal lockers in Dressing 108.
    9.  Remove a portion of the existing concrete block wall as required to Install a new 6’-0” wide by 7’-0” high exterior door at Team Room 101.
  10.  Eliminate the exterior windows in the ground level building.  Install new concrete blocks to fill the openings after the existing windows are removed.
  11.  Pour new concrete between the existing sidewalk and the stadium building.  See Note No.      4 on sheet A2.1 and Note No. 13 on sheet A2.2 of the Plans.
  12.  Interior Painting - Ground Level Building - Paint all interior walls, moldings, wood trim, ceilings, doors, door frames, shelving. cabinets, exposed conduit and              air conditioning frames.  The intent is to paint all paintable items and surfaces.  Strip and/or properly prepare all surfaces prior to painting.
  13.  Exterior painting – Paint all exterior surfaces that are presently painted.  Strip and/or properly prepare all surfaces prior to painting.
  14.  Remove the existing 4” concrete block wall in Team Room 101. 
  15.  Remove the existing metal lockers in Team Room 101. Repair the walls as required forpainting.
  16.  Install two new fire extinguishers on new wall brackets.
  17.  Install new metal cover plates over the holes in the plywood ceilings where the existing ceiling mounted heaters were removed.
  18.  Remove one of the existing hollow metal doors and frame at Hall 100 and fill in the opening with new concrete blocks.
  19.  Remove a portion of the existing wall as required to install a new exterior door.
  20.  Remove the existing wood door and frame and install a new hollow metal door and frame.
  21.  Install new concrete blocks at the hole in the wall where the existing wall heater was located in Office 104 and Office 105.
  22.  Remove the damaged plywood ceiling panels (4’ x 8”) and replace with new plywood panels.
  23.  Remove the existing wood wall above the existing concrete counter at Equipment 111.  Install a new wood wall in it’s place after demolition.
  24.  Remove the paint from the existing aluminum steps and then paint the steps. See NoteNo. 12 on sheet A2.1 and Note No. 12on sheet A2.2 of the Plans.
 
ADD ALTERNATE NO. 1:
The Contractor shall furnish all materials and labor required to remove the existing corrugated metal roof panels at the Ground Level Building and replace it with new prefinished metal roof panels.  Remove and replace the treated wood roof stripping as required to install the new roof.

BID SUBMITTAL INFORMATION
Creator Username: IPSB
Bidding Privacy: Bid encryption
Started: 02-Aug-2016 04:00:00 PM
Ends: 07-Sep-2016 05:30:00 PM ( Expired )
History: 872 Views
Event Status: Expired since 07-Sep-2016 05:30:00 PM
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
30-Aug-2016 11:55:30 AM
Added Addendum No.2
18-Aug-2016 02:49:09 PM
Added Addendum No.1
18-Aug-2016 02:48:12 PM
Added Addendum No.1
18-Aug-2016 02:47:50 PM
Addendum No.1
18-Aug-2016 02:47:28 PM
18-Aug-2016 02:44:06 PM
 
BID HISTORY
Username Bid Amount Type Company name Bid Amount Bid Placed
SBCCLLC
For entire project Steel Building Construction Co. 0.0000 07-Sep-2016 04:46:46 PM
 
Bid for:
Renovations to the Football Stadium
Loreauville High School
Loreauville, La.
Bid No. 1058
To:
Iberia Parish School Board
1500 Jane Street
New Iberia, La. 70560
Bid Date: September 7, 2016
Bid Time: 5:30 PM
 
Contractor:
SBCC, LLC
1129A Mustang Circle
Saint Martinville, La. 70582
Contractor License #46635
Delivery: 150 Days
cuzanservices
For entire project Cuzan Services 0.0000 07-Sep-2016 05:12:44 PM
 
Project Name
Loreauville High School Football Stadium Renovation
Bid #1058

Bidder Name
Cuzan Services, LLC
P.O. Box 481
Belle Chasse LA 70037
Lic# 45475


 
Delivery: 0 Days
MINVIELLELUMBER
For entire project MINVIELLE LUMBER CO. 0.0000 07-Sep-2016 05:16:40 PM
 
MINVIELLE LUMBER COMPANY
1412 SOUTH STATE ST.
ABBEVILLE, LA 70510
LICENSE #29389

RENOVATIONS TO THE FOOTBALL STADIUM
LOREAUVILLE HIGH SCHOOL - Loreauville, Louisiana
IBERIA PARISH SCHOOL BOARD NO. 1058

BID DATE: September 7, 2016
TIME: 5:30 PM

IBERIA PARISH SCHOOL BOARD
BOARD ROOM - ATTN. DAVID DELAHOUSSAYE
1500 JANE ST.
NEW IBERIA, LA 70562-0200
 
Delivery: 0 Days
ARL
For entire project Acadiane' Renovations, Ltd 0.0000 07-Sep-2016 05:28:40 PM
 
BID FOR:        Renovations to the Football Stadium
                         Loreauville High School – Loreauville, Louisiana
                         Iberia Parish School Board Bid No. 1058
 
 
OWNER:        Iberia Parish School Board
                        1500 Jane Street
                        New Iberia, Louisiana 70560
 
 
CONTRACTOR:     Acadiane’ Renovations, Ltd.
                                 15223 Hwy. 182 West
                                 Franklin, LA  70538
         State of Louisiana Contractors License Number: 16992
  
 
BID DATE:      September 7, 2016 @ 5:30 PM
 
 
ARCHITECT:      Darby Architects
                              101 S. Evangeline Street
                              New Iberia, LA 70560
 
 
Delivery: 0 Days
Bids Added by Agency/Owner
Username Bid Amount Type Company name Bid Amount Bid Placed