${amount}
The Base Bid includes the replacement of the existing HVAC system with a new VRF HVAC system. Alternate No. 1 includes the work required to replace the existing exhaust fans as indicated in the Contract Documents. Alternate No. 2 includes the work required to remove the existing HVAC equipment, piping and accessories as indicated in the Contract Documents. For Clarification, the existing chillers and chilled water pump remain in use. Alternate No. 3 includes the work required to replace the existing kitchen hood makeup air units as indicated in the Contract Documents.
A Pre-Bid Conference will be held at 10:30 AM on Tuesday, June 2, 2015 at the Acadiana Techanical College (SLCC) Main Lobby, 1101 Bertrand Drive, Lafayette, LA 70506.
BUY NOW