DU-LA-243-01 Bayou Sauvage NWR-Hydrological Enhancement
Ducks Unlimited > Ducks Unlimited - Southern Region
Solicitation: 39738370
Listing Information/Advertisement:


The work on this project consists of initially removing an existing timber bulkhead water control structure and replacing it with 2 aluminum flashboard risers with 36’ culverts supplied and installed by the contractor.  Additionally, another structure is to be installed through an existing levee consisting of timber supported vinyl sheet piling, 2 aluminum flashboard risers, and corrugated HDPE pipe supplied by DU.  The final portion consists of removal of an existing timber bulkhead water control structure and replacing it with 1 aluminum flashboard risers with a 36’ culvert supplied and installed by the contractor.  Two structures shall be installed without dewatering (WCS#1 & WCS#3), and one wall shall be installed while the site is dewatered (WCS#2).

SUBMITTAL INFORMATION
Creator Username: DUSRJF
Bidding Privacy: Bid encryption
Started: 20-Jun-2023 4:30:00 PM CDT
Ends: 14-Jul-2023 11:00:00 AM CDT ( Expired )
History: 294 Views
Event Status: Expired since 14-Jul-2023 11:00:00 AM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
23-Jun-2023 1:32:14 PM CDT
Addendum 1: Bid Solicitation Revised Sentence - ?Bids shall be submitted online through Central Bidding by 11:00 A.M. CST on Friday, July 14, 2023.?