PROJECT NO. SAP-67(10)S
|
HOT | MIX | ASPHALT, | (ST) | {9.5MM) | 1,624.000 | TON |
HOT | MIX | ASPHALT, | (ST) | {9.5MM) | 96.000 | TON |
HOT | MIX | ASPHALT, | {ST) | {9.5MM), | 1,788.000 | TON |
LEVELING | ||||||
POLYMERIZED-EMULSIFIED ASPHALT, | 77,749.000 | GAL | ||||
GRADE CRS-2P | ||||||
COARSE AGGREGATE COVER MATERIAL, | 896.000 | CY | ||||
SIZE 6, (CRUSHED STONE) | ||||||
SEAL AGGREGATE COVER MATERIAL, | 1,424.000 | CY | ||||
SIZE 7, {CRUSHED STONE) BLOTTER MATERIAL | 1,908.000 | CY | ||||
MAINTENANCE OF TRAFFIC | LUMP SUM | LS | ||||
ADDITIONAL CONSTRUCTION SIGNS | 0.000 | SF | ||||
4" WIDE THERMOPLASTIC EDGE STRIPE | 19.385 | MI | ||||
{CONTINUOUS WHITE) (90 MILS) | ||||||
4" WIDE THERMOPLASTIC TRAFFIC | 7.507 | MI | ||||
STRIPE {SKIP YELLOW) (120 MILS) | ||||||
4" WIDE THERMOPLASTIC TRAFFIC | 41,768.000 | LF | ||||
STRIPE {CONTINUOUS YELLOW) | ||||||
(120 MILS) | ||||||
THERMOPLASTIC LEGEND | 540.000 | LF | ||||
(WHITE) (120 MILS) | ||||||
TWO-WAY YELLOW REFLECTIVE HIGH | 806.000 | EA | ||||
PERFORMANCE RAISED MARKERS | ||||||
REFLECTORIZED TRAFFIC WARNING SIGN | 20.000 | EA | ||||
(ENCAPSULATED LENS) | ||||||
REFLECTORIZED TRAFFIC REGULATORY | 9.000 | EA | ||||
SIGN (ENCAPSULATED LENS) | ||||||
REFLECTORIZED TRAFFIC OBJECT MARKER | 10.000 | EA | ||||
(ENCAPSULATED LENS) (TYPE 3) | ||||||
ROADBED RECLAIMATION | 44,775.000 | SY |
Creator Username: | GrdnerEngRC |
Bidding Privacy: | Bid encryption |
Started: | 19-Jun-2023 7:00:00 PM CDT |
Ends: | 06-Jul-2023 10:00:00 AM CDT ( Expired ) |
History: | 341 Views |
Event Status: | Expired since 06-Jul-2023 10:00:00 AM CDT |
Actions: |
Sign-In to Bid
|
Visitors: | Visitors/Central Bidding Plan Holders |
Username | Bid Amount Type | Company name | Bid Amount | Bid Placed | ||
|
For entire project | Phillips Contracting Co., Inc. | =SEALED= | 06-Jul-2023 9:24:46 AM CDT | ||
Phillips Contracting Co., Inc.
P.O. Box 7530 Columbus, Ms 39705 COR # 00229-MC Sunflower County Board of Supervisors Sunflower County Courthouse 200 Main Street Indianola, Ms bid for: SAP-67(10)S Sunflower co., Construction of 9.716 miles of reseal on roads A-B bid time: 7/6/23 @ 10am Delivery: 0 Days
|
Username | Bid Amount Type | Company name | Bid Amount | Bid Placed |