Post Road WWTP Attachment: Post Road WWTP Volume 1.pdf 
Louisiana > City of Carencro
Sealed Bid: 46101313
Listing Information/Advertisement
The work includes the construction of the new Post Road Wastewater Treatment Plant which generally includes a preliminary treatment unit complete with fine screens and grit removal equipment, flow distribution box, 4 cell sequencing batch reactor system, tertiary filters, chlorine contact chamber, Parshall Flume, post aeration basin, sludge holding and dewatering facilities, Control and Maintenance buildings, piping, SCADA system,  instrumentation and controls, generators, painting, electrical work, site road, fencing grading and drainage, site work and other appurtenant and related items of construction. Also included is the demolition of the existing Post Road and Manola Wastewater Treatment Plants after the new plant has been in operation at least 30 days of continuous operation.  Construction and start-up of the new plant shall be completed within 500 calendar days from the Notice to Proceed.  Remaining work on the site, buildings and demolition of the existing facilities shall be completed within 600 calendar days from the Notice to Proceed.

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
11-Jul-2025 8:02:22 AM CDT
title