Furnish all materials, equipment, labor, and supervision and performing all operations necessary for the completion of Mississippi State Port Authority “Chemours Enhancement Project” at Gulfport, Mississippi as described in the contract documents.  The Contractor shall provide and furnish all tools, equipment, materials, supervision, labor, subsistence, rental, subcontractors, permitting, profit, overhead, appropriate taxes and any other related costs. The Contractor shall provide all materials required, except those specifically indicated as being Owner Furnished by Mississippi State Port Authority at Gulfport. The work includes all that is necessary to provide the Owner with a complete project.
The work consists of, but is not limited to:
MODIFICATION OF EXISTING STAIRS
INSTALLATION OF METAL STAIRS
INSTALLATION OF DOORS & PANELS FOR SILOS
INSTALLATION OF METAL CANOPIES
WEIGH BIN MODIFICATIONS
COMPLETE, FUNCTIONAL RACK AND PINION ELECTRICAL PASSENGER / SERVICE ELEVATOR
MODIFICATIONS TO THE TRACK MOUNTED HOPPER GRIZZLEY
EMERGENCY GATE MODIFICATIONS
REPLACEMENT OF AIR COMPRESSOR AND AIR DRYER, COMPLETE WITH ALL ELECTRICAL AND PIPING MODIFICATIONS
 

Additional Notes/Requirements
A pre-bid conference will be held at 2:00 p.m. local time on Thursday, May 31, 2018 at 2510 14th Street, Suite 1450, Gulfport, Mississippi 39501 to be followed by a site inspection trip. Each Bidder is required to visit and inspect the site of Work to fully obtain exact work scope and work requirements. For further information contact Mr. John H. Webb, Deputy Port Director, Engineering, at (228) 865-4300 or fax (228) 865-4307.
SUBMITTAL INFORMATION
Creator Username: MSPACF
Bidding Privacy: Bid encryption
Started: 16-May-2018 8:00:00 AM CDT
Ends: 19-Jun-2018 11:00:00 AM CDT ( Expired )
History: 4258 Views
Event Status: Expired since 19-Jun-2018 11:00:00 AM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
11-Jun-2018 3:18:27 PM CDT
Addendum No. 1 and Cover Letter-Chemours Enhancement Project