The Work to be performed consists of furnishing all plants, equipment, labor and materials for performing all Work required t o r e p a i r F l o o d G a t e s W- 3 3 & E -0 7 including mobilization, demobilization, and other related work all in accordance with these Contract Documents. The Contractor shall demolish an existing portion of the Flood Gate W-33’s wall, column and sill and replace in-kind, repair the existing precast overhead beam, replace overhead beam on new column and reinstall the existing overhead gate. The Contractor shall also demolish a portion of the existing sill on Gate E-07 and repair a section of the wall. All debris, trash or other incidentals used by the Contractor shall be removed from the Project Site and properly disposed of prior to Final Acceptance and demobilization. The Contractor shall also install and remove Temporary Flood Protection as required by the SLFPA-E.