HOUMA NAVIGATION CANAL LOCK COMPLEX PROJECT (TE-113) PHASE 2
Louisiana > Terrebonne Levee and Conservation District
Sealed Bid: 85923974
Listing Information/Advertisement:


SECTION A
 
INVITATION TO BIDDERS
 
Sealed Bids will be received by the Terrebonne Levee and Conservation District at their office located at 220-A Clendenning Road, Houma, LA 70363 until 3:00 PM on Thursday, December 21, 2023.  Bids will be publicly opened and read aloud at their office. 
 
Bidders will have the option to submit their Bids electronically or by paper copy.  Electronic Bids are accepted at Central Bidding. Central Bidding can be accessed at www.centralbidding.com. For questions related to the electronic bidding process or obtaining the Bidding / Contract Documents & Specifications electronically, please call Central Bidding at 225-810-4814.
 
Bids received prior to the time of the scheduled bid opening will be securely kept unopened.  No Bid received after the scheduled time for opening will be considered.  Failure of the U.S. Mail or of any express carrier or delivery service to deliver the Bid prior to the date and time of the above stated Bid Opening shall not be considered due cause for the scheduled time of the Bid Opening to be extended.
 
Houma Navigation Canal Lock Complex
Project (TE-113)
PHASE 2
Project consists of:
 
Gulf Side Sector Gate (GSSG)
Lock Chamber
Inland Side Sector Gate (ISSG)
Floodwalls

East Braced Floodwall
Braced Floodwall Between GSSG and 250’ Floodgate

Dewatering Bulkheads and Storage area
Protection Fendering, Nose Piers and East Side Protection Dolphins
Civil

Complete East Levee Tie-Ins
Dredging of East Floodwall Access Channel
Operations Area Bulkhead, Limestone Surfacing, Maintenance Building and Boat Ramp and Lift
Control Building
Control Building Access Bridge
Site Fencing
Erosion Protection – Channel Scour Protection and East Levee Tie-In Scour Protection
Signage
Utilities (Complete)

Mechanical/Electrical 
Bids must be submitted on the Louisiana Uniform Public Work Bid Form furnished with the Contract Documents. Bid sheets will be issued only to Contractors and/or Subcontractors licensed in accordance with the provisions of LA R.S. 37:2150 through 2173 of the Louisiana Legislature.  Contractors desiring to bid shall submit their Louisiana Contractor’s License Numbers as evidence that they hold a license of the proper classification that is in full force and effect. 
 
Contract Documents are on file in the office of Aptim Environmental & Infrastructure, L.L.C. hereinafter referred to as ENGINEER, 1200 Brickyard Lane, Suite 202, Baton Rouge, LA 70802 or by contacting Ms. Nicole Buranzon at (225) 302-3283 or [email protected]. A notice of request shall be sent to the ENGINEER 48 hours prior to confirm Contract Document availability.
 
In accordance with Louisiana Public Bid Law, prime Bidders shall be charged a deposit of $500.00 for one (1) set of Contract Documents, and upon return of the complete Contract Documents in good condition within 10 days from receipt of Bids, shall be refunded the full deposit. 
 
A mandatory Pre-Bid Conference will be held on Wednesday, September 13, 2023 at 10:00 AM at the Barry P. Bonvillain Civic Center located at 346 Civic Center Blvd., Houma, LA 70360. All prospective bidders shall be present at the beginning of the pre-bid conference and shall remain in attendance for the duration of the conference. Any prospective bidder who fails to attend the conference in person or remain for the duration of the conference shall be prohibited from submitting a bid for the project.
 
Electronic attendance can be accessed via Microsoft Teams upon request to [email protected], however, electronic attendance via Microsoft Teams shall not substitute for official in-person attendance, and therefore, bids from electronic attendees will not be accepted.
 
An optional site visit will immediately follow the Pre-Bid Conference. Three (3) additional dates have been scheduled for prospective bidders to be given access to visit the project site on September 20, September 27 and October 4, 2023 from 9:00 AM to 3:00 PM.  Additional site visits will be available with 24 hours notice, M-Th 9:00 AM-3:00 PM. Please call Greg Gautreaux at 985-709-1090 or Carlton Smith at 985-860-6043 to schedule.
 
Bidders are required to comply with La. R.S. 38:2212.B.(5), as may be amended (further described in the Instructions to Bidders). Failure to include a copy of the appropriate signature authorization, if required, shall result in the rejection of the bid as non-responsive. 
 
All Bids shall be accompanied by a Certified Check, Cashier's Check or Bid Bond in the amount of five (5%) percent of the amount of the Bid made payable to the Terrebonne Levee and Conservation District.  Failure to do so will result in the Bid/Bids being declared nonresponsive and shall be cause for rejection.
 
A Bid will be considered responsive if it conforms in all respects with the conditions and requirements of the Contract Documents.In order to be considered responsive, the Louisiana Uniform Public Works Bid Form must; (a) be fully completed, and signed and be responsive in all respects to the Contract Documents; (b) be made on the Bid Forms provided. The Terrebonne Levee and Conservation District reserves the right to reject any and all bids in accordance with State Bid Law.
 
The Bidder must be a properly licensed CONTRACTOR under the provision of Chapter 24 of Title 37, Louisiana Revised Statutes, together with any other applicable laws.Work Classification: Heavy Construction.
 
Bidder shall certify he holds an active license under La. R.S. 37:2151 et seq. by displaying his license number on the outside of the sealed envelope containing his Bid. In the case of an electronic bid proposal, Bidder shall certify he holds an active license by having his electronic bid accompanied by the contractor's license number, which may be satisfied by showing his license number on the Bid Form above the signature of his duly authorized representative.
 
Attention of Bidders is called particularly to the requirements for conditions of employment to be observed (including but not limited to the Contract Work Hours and Safety Standards Act - 40 U.S.C. §§ 3701-3708) and minimum wage rates to be paid under the Contract (Davis-Bacon Act). Attention of Bidders is also called to Section 3 of the Housing and Urban Development Act of 1968, Section 109 (Non-Discrimination) of the Housing and Community Development Act of 1974, Section 503 (Non-Discrimination Against Employees with Disabilities) of Rehabilitation Act of 1973, Segregated Facilities, Executive Order 11246, insurance and bonding requirements of the contract documents, and all applicable laws and regulations of Federal government and State of Louisiana.
 
Any person with disabilities requiring special accommodations must contact the OWNER no later than seven (7) days prior to bid opening.
 
Successful Bidder must register with the Terrebonne Parish Sales and Use Tax Department for use tax purposes. 
 
 
 
                                                                   /s/ Reggie Dupre
REGGIE DUPRE, EXECUTIVE DIRECTOR
TERREBONNE LEVEE AND CONSERVATION DISTRICT


Please publish 3 times: 
August 24, 2023
August 30, 2023
September 6, 2023


SUBMITTAL INFORMATION
Creator Username: terrleve
Bidding Privacy: Bid encryption
Started: 24-Aug-2023 1:00:00 PM CDT
Ends: 21-Dec-2023 3:00:00 PM CST ( Expired )
History: 5420 Views, 2 Messages
Event Status: Expired since 21-Dec-2023 3:00:00 PM CST
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
DOWNLOAD BID DOCUMENTS
Invitation to Bidders HNC Lock Complex Project Phase 2.pdf (181.3 KB)
HNC Lock Complex Phase 2 IFB Plans March 2023 Vol 3.pdf (40.6 MB)
HNC Lock Complex Phase 2 IFB Plans March 2023 Vol 2.pdf (46.6 MB)
HNC Lock Complex Phase 2 IFB Plans March 2023 Vol 1.pdf (60.2 MB)
HNC Lock Complex Phase 2 IFB Plans March 2023 Vol 4.pdf (62.9 MB)
HNC Lock Complex Ph2 IFB Contract Docs and Specs Vol. 1-9_Aug 2023.zip (25.6 MB)
HNC Lock Complex_Phase 2_Addendum 1 Stamped with Attachments.pdf (13.1 MB)
HNC Lock Complex_Phase 2_Addendum 2 Stamped With Attachments.pdf (35.5 MB)
HNC Lock Complex_Phase 2_Addendum 3 Stamped With Attachments.pdf (35.3 MB)
HNC Lock Complex_Phase 2_Addendum 4 Stamped With Attachments.pdf (6.3 MB)
A1G-101 - Proposed Project Features.kmz (5.7 MB)
HNC Lock Complex_Phase 2_Addendum 5 Stamped with Attachments.pdf (2.5 MB)
Ardaman Final Geotechnical Engineering Report.pdf (81.9 MB)
HNC Lock Complex_Phase 2_Addendum 6 Stamped with Attachments.pdf (16.9 MB)
HNC Lock Complex_Phase 2_Addendum 7 Stamped with Attachments.pdf (1.2 MB)
HNC Lock Complex_Phase 2_Addendum 8 Stamped with Attachments.pdf (9.8 MB)
HNC Lock Complex_Phase 2_Addendum 9 Stamped with Attachments.pdf (4.9 MB)
HNC Lock Complex_Phase 2_Addendum 10 Stamped with Attachments.pdf (2.7 MB)
Ardaman 60 PCT Geotechnical Report_Rev 2_1 of 2.pdf (72.0 MB)
Ardaman 60 PCT Geotechnical Report_Rev 2_2 of 2.pdf (74.9 MB)
HNC Lock Complex_Phase 2_Addendum 11 Stamped With Attachments.pdf (2.2 MB)
HNC Lock Complex_Phase 2_Addendum 12 Stamped with Attachments.pdf (1.4 MB)
Ardaman Test Pile Program Report_Part 2.pdf (71.0 MB)
Ardaman Test Pile Program Report_Part 1.pdf (74.5 MB)
HNC Lock Complex_Phase 2_Addendum 13 Stamped with Attachments.pdf (20.6 MB)
HNC Lock Complex_Phase 2_Addendum 14 Stamped with Attachments.pdf (21.6 MB)
USACE EP 310-1-6a and 6b.zip (75.5 MB)
HNC Lock Comple_Phase 2_Addendum 15 Stamped.pdf (704.2 KB)
PUBLIC MESSAGE BOARD
Discuss questions with the owner/creator of this Listing.
mansongulf on 22-Dec-2023 10:24:07 AM CST
Will the bid results be published on the Central Bidding or other Website?
RHLC18 on 09-Jan-2024 9:04:53 AM CST
Also wondering if bid results be published on the Central Bidding or other Website?
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
20-Dec-2023 4:21:58 PM CST
Note: Section A Invitation to Bidders has been changed/updated as per request of Engineering firm.
18-Dec-2023 2:45:24 PM CST
..
18-Dec-2023 2:44:04 PM CST
Bidders, please note the addition of Addendum NO. 15 to this project.
15-Dec-2023 11:43:00 AM CST
Bidders, please note the addition of Addendum No. 14 along with a USACE ZIP file to this project.
08-Dec-2023 11:43:09 AM CST
Bidders, please note the addition of Addendum No. 13 to this project.
01-Dec-2023 11:53:40 AM CST
Bidders, please note the addition of files to this project today.
22-Nov-2023 10:51:16 AM CST
Bidders, please note the addition of Addendum NO. 11 changing the bid opening time to 3:00 P.M.
20-Nov-2023 1:17:22 PM CST
Bidders, please note the addition of files to this project.
17-Nov-2023 11:16:06 AM CST
Bidders, please note the addition of Addendum No. 10 to this project.
09-Nov-2023 11:33:20 AM CST
Bidders, please note the addition of Addendum No. 9 to this project.
03-Nov-2023 9:46:31 AM CDT
Bidders, please note the addition of Addendum No. 8 to this project.
27-Oct-2023 8:19:33 AM CDT
Bidders, please note the addition of Addendum No. 7 to this project.
20-Oct-2023 10:49:51 AM CDT
Bidders, please note the addition of Addendum No. 6 to this project. The bid opening date has been extended to December 21, 2023 at 10:00 A.M.
13-Oct-2023 10:38:33 AM CDT
Bidders, please note the addition of Addendum No. 5 and the Ardaman Final Geotechnical Engineering Report.
06-Oct-2023 8:59:35 AM CDT
Bidders, a KMZ file has been added to this listing.
06-Oct-2023 8:49:20 AM CDT
Bidders, please note the addition of Addendum No. 4 to this project.
29-Sep-2023 10:03:08 AM CDT
Bidders, please note the addition of Addendum No. 3 to this project.
22-Sep-2023 10:55:46 AM CDT
Bidders, please note the addition of Addendum No. 2 to this project.
18-Sep-2023 3:48:27 PM CDT
Bidders, please note the addition of Addendum NO. 1 to this project.
24-Aug-2023 11:21:30 AM CDT
Attachments uploaded.