TO: All Prospective Bidders
PROJECT: England Economic & Industrial Development
South Apron Expansion – Phase 1
CLASSIFICATION: Highway, Street and Bridge
PROJECT ENGINEER: Josh Barrett, P.E.
ENGINEER’S ESTIMATE: $4.65 Million
NON-MANDATORY PRE-BID: Thursday, June 19, 2025 @ 3:00 P.M.
MML&H
100 Engineer Place
Alexandria, LA 71303
BID DATE: Tuesday, June 24, 2025 @ 2:00 P.M.
BID LOCATION: MML&H
100 Engineer Place
Alexandria, LA 71303
MAJOR ITEMS OF WORK: All quantities are approximate
Class V Reinforced Concrete Arch Pipe - Various Sizes (36”-48” Equivalent) 1,250 L.F.
Reinforced Concrete Catch Basins and Junction Boxes 8 Total
Lime Treated Subgrade (5% by Volume, 12” Thick) 11,640 S.Y.
Cement Treated Subgrade (9% by Volume, 12” Thick) 11,640 S.Y.
Lean Concrete Base Course (8” Thick) 11,640 S.Y.
P-501 PCC Pavement (14.5” Thick) 11,560 S.Y.
Lighting Demolition, Relocation, and Installation Lump Sum
The Bid Proposals, Plans, Specifications, Forms of Contract, and Forms of Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the office of the Engineer:
Meyer, Meyer, LaCroix & Hixson, Inc.
Telephone (318) 448-0888
100 Engineer Place
Alexandria, Louisiana 71303
A USB flash drive of the bid documents may be obtained from the office of the Engineer. The cost per USB flash drive will be $40.00 non-refundable, which represents the cost of reproduction and handling. Any requests for bid documents shall be accompanied by payment in full.